A.K.Jha, Director (Technical), NTPC Limited visited the two solar power plants located at NTPC Kaniha which is under construction on 25.01.2014. The solar plants are being constructed at Stage II Township & Patharmunda (main plant campus) with installed capacity of 8 MW & 2 MW respectively.The 10 MW PV solar is...