Around 72 MW RE Installations during Oct makes India's RE portfolio to 29.5 GW; no solar installations during the month

In the month of October 2013, Indian Inc has installed around 72 MW of renewable energy projects amounting to around 1468 MW renewable energy installations during the FY13-14 and 29537 MW cumulatively upto 31st October 2013.

Most of this installations are coming from Wind despite various policy and financial hurdles are being faced by the industry. During the month around 52 MW capacity of Wind Project have been commissioned in the country.

The second source is small hydro projects with 20 MW installations.

No other renewable energy source including Solar PV has seen any installations during the month. Around 395 MW of Solar PV Projects have been commissioned during the current financial year so far.

As can be seen from the below figure, Wind still accounts for more than 68% of the total renewable energy share followed by small hydro (13%) and Bagasse (8%) with Solar PV coming close by 7%.

 

image

Figures are in MW

 

However, most of the energy resource installations are still falling short of targets for the current financial year.

Energy Source

% Achievement of the FY13-14 Target so far

Wind

35%

Small Hydro

38%

Biomass

19%

Bagasse

18%

Waste to Energy

15%

Solar PV

36%

The complete statistics of the renewable energy installations during the month of October 2013 as well cumulative for FY13-14 and till date are depicted below:

Renewable Energy Programme/ Systems

Target for 2013-14

Deployment during

October, 2013

Total Deployment

in  2013-14

Cumulative achievement up to 31.10.2013

I.   POWER FROM RENEWABLES:

A.   GRID-INTERACTIVE POWER   (CAPACITIES IN MW)

 

 

Wind Power

2500

52.25

880.73

19933.68

Small Hydro Power

300

20

114.5

3746.75

Biomass Power

105

-

20

1284.8

Bagasse Cogeneration

300

-

55.05

2392.48

Waste to Power           -Urban

20

-

3

99.08

                                  -Industrial

-

-

 

Solar Power (SPV)

1100

 

395.13

2079.97

Total

4325

72.25

1468.41

29536.76

B.    OFF-GRID/ CAPTIVE POWER  (CAPACITIES IN MWEQ)

 

 

Waste to Energy                   -Urban

10

3

3

118.57

-Industrial

     

Biomass(non-bagasse) Cogeneration

80

2.85

22.54

493.69

Biomass Gasifiers                 -Rural- Industrial

1

-

 

16.924

9

-

4.74

146.32

Aero-Genrators/Hybrid systems

1

-

0.03

2.14

SPV Systems (>1kW)

40

-

14.32

138.99

Water mills/micro hydel

500 Nos.

-

-

10.65 (2131 nos)

Bio-gas based energy system

2

-

-

-

Total

143

5.85

44.63

927.28

II. REMOTE VILLAGE ELECTRIFICATION

No. of Remote Village/Hamlets provided with RE Systems

-

-

-

-

III. OTHER RENEWABLE ENERGY SYSTEMS

Family Biogas Plants

 (No. in lakhs)

1.1

-

0.15

46.83

Solar Water Heating - Coll. Areas (Million m2)

0.6

0.04

0.31

7.31

Source: MNRE