Featured Articles...

December 27, 2013

Monthly review of Indian Power Sector for the month of November 2013...

 

Monthly review of Indian Power Sector for the month of November 2013...

During the month of November 2013, around 1635 MW of generating capacity has been installed under the Indian Power Sector reaching the total cumulative generating capacity at around 232.16 GW.

Further around 1226 Circuit Kms of transmission lines are also added.

 

Summary of the review of Indian Power Sector for the month of November 2013 is depicted below:

  • Electricity Generation for the month was at 79.52 BUs
  • Generating Capacity Addition for the month was 1635 MW
    • Dhariwal TPP U-1 (300 MW) in Maharashtra  by Dhariwal Infastructure (P) Ltd on 3/11/2013
    • Shre Sangaji TPP U-1 (600 MW) in Madhya Pradesh by MPPGCL on 18/11/2013
    • Barh STPS St-II, U-4 (660 MW) in Bihar by NTPC on 30/11/2013
    • Nimmo Bazgo HE Project U-1 (15 MW) in J&K by NHPC on 2/11/2013
    • Uri-II, U-2, (60 MW) in J&K by NHPC on 16/11/2013
  • The all India installed capacity reaches at 232164.94 MW
  • Transmission Lines for 1226 Circuit Kms installed during the month
  • Transformation Capacity Addition during the month was 4580 MVA
  • Average Power Supply deficit was around 4.1% during the month
    • Northern Region - 6.5%,
    • Western Region - 1.1%,
    • Southern Region - 5.9%,
    • Eastern Region - 1.5%,
    • North Eastern Region - 4.6%
  • Peak Power Supply deficit was at 2.9%
    • Northern Region - 1.1%,
    • Western Region - 0.8%,
    • Southern Region - 6.8%,
    • Eastern Region - 1.4%,
    • North Eastern Region - 3.9%
  • All India Plant Load Factor maintained was around 65.44%
    • Central Generating Plants -  77.12%,
    • State Generating Plants - 58.67%,
    • Private Generating Plants - 69.47%