Featured Articles...

November 19, 2013

India says domestic plant operators can limit global nuclear suppliers' liability...

 

domestic nuclear plant operators

To allay global nuclear suppliers' fears about India's nuclear liability laws that have deterred potential investors, the country is now telling the world's nuclear industry that the domestic plant operator can limit the amount as well as duration of the liability that accrues to foreign suppliers.

Planning Commission deputy chairman Montek Singh Ahluwalia, a close associate of Prime Minister Manmohan Singh, conveyed this interpretation of the 2010 nuclear liability law in a meeting with Canada' industry leaders late last month.

The Congress-led United Progressive Alliance had worked overtime in its first innings to secure a new nuclear cooperation regime after decades of global isolation, but it has been unable to jumpstart its massive nuclear power agenda as vendors from around the world have stopped in their tracks over what they have labelled as unviable liability laws.

Read more

Read More...

India-Nepal cross border power transmission capacity to get augmented...

 

India-Nepal Cross Border Transmission Line

Nepal with high hydropower potential and its neighbor India with high power demand have agreed to significantly boost up trans-border power transmission line to conduit the excess power from new hydro projects in West Nepal to India. A new World Bank loan sanctioned recently will facilitate early completion of the capacity augmentation project.

The planned immediate capacity augmentation is for at least 1000MW. In addition to the long planned Butwal in West Nepal to Gorakhpur in India line, There are simultaneous plans to construct three other cross-border transmission lines from Butwal-Gorakhpur, Duhabi-Purniya, Anarmani-Siliguri or Dhalkebar to Mujaffarpur


After having the issue discussed with Indian authority through Nepal's External Affairs Ministry, both the countries have come to a final agreement on the matter in meeting of Energy Group under the South Asian Sub-Regional Cooperation.

With a recently granted World Bank loan of USD 37 million, Nepal and India will have at least two double circuit transmission corridors between Dhalkebar-Muzaffarpur and Hetuda-Dhalkebar-Duhabi. These will be of 90 and 40 km length respectively.

According to Nepal Minister for Science, Technology and Environment Mr. U. Jha, this augmentation of power import is must for Nepal especially in dry season. Hydropower rich, Nepal gets highly power starved during dry winter season due to low water flow through its rivers. Then it needs to import around 150MW power to meet even basic minimum need. But the present cross border transmission infrastructure gets only around 50MW to Nepal.

On the other side, more than five big hydropower projects with a collective capacity of around 20,000 MW are under feasibility study in West Nepal. Nepal cannot consume the output of those. If exported, the surplus power, generated out of these projects with renewable source to India, can get the financially crunched Nepal into a more comfortable situation.

Across the border, "Demand in Indian national grid is increasing rapidly. Rate of this demand growth in Eastern India is high. Proper power evacuation from Nepal can be of great help for India to meet up this extra demand," said Power Grid Corporation Limited officials.

Source

Read More...

India, Australia to hold talks for civil nuclear power co-operation on 26-27 November...

 

India Australia to hold civil nuclear talks

Australia and India are to hold the third round of their civil nuclear cooperation talks Nov 26-27 to pave the way for early conclusion of the agreement, visiting Australian Foreign Minister Julie Bishop said in New Delhi on Monday after talks with External Affairs Minister Salman Khurshid.

Australia would also support India's membership of the Nuclear Suppliers Group (NSG), Bishop said during a joint press conference.

The two sides inked two agreements, including a statement of intent between the Australian government and Nalanda University.

Bishop said both sides hoped to conclude the civil nuclear cooperation negotiations that would pave the way for the sale of Australian uranium to India.

She said both sides are negotiating in "good faith" and added that the Tony Abbot government, which took office after elections in September, is in favour of selling uranium to India.

Australia and India are also planning to begin negotiations on a free trade agreement, she said.

Khurshid said both sides were looking to schedule a visit early next year of new Australian Prime Minister Tony Abbott to India.

"We are looking at an early slot for him to come down next year," he said.

The visit was being planned amid indications that Abbott "wants to begin his term with a fruitful visit to India", he said.

Australia and India are also increasing air connectivity with Air India deciding to start direct flights to Sydney and Melbourne and Air Australia planning to launch direct flights to India, said Khurshid.

The external affairs minister said Indian business had an "impressive footprint" on Australian soil and hoped that a larger number of Indian companies will invest in Australia.

An Indian-Australian CEOs' forum is to meet soon, he said.

Bishop said she wanted to visit India early in her tenure "to show the significance we attach to ties with India".

She said the "ambitious" free trade agreement (FTA) they planned to negotiate would be mutually beneficial.

As part of their deepening engagement in security cooperation, the navies of the two countries are to hold joint exercises.

Both sides also discussed cooperation in counter-terrorism and cyber security.

In the field of energy security, Bishop said India could count on Australia for its "trusted and reliable support" for its needs, including coal, LNG and civil nuclear energy cooperation.

Bishop said there were "no specific time lines" in concluding the civil nuclear agreement with India and both were "waiting to get it right".

Energy-starved India aims to upgrade its nuclear power generation capacity to 20,000 megawatts (MW) by 2020.

Australia has one of the largest known uranium reserves in the world.

Australia, a key member of the Nuclear Suppliers Group, had earlier been opposed to selling uranium to India as New Delhi has not signed the Nuclear Non-Proliferation Treaty (NPT). It reversed its policy in 2011.

Bishop also said her country welcomes Indians coming to Australia to pursue higher education.

As part of wooing bright Indian minds to that country, the Abbott government has proposed a new programme under which students can pursue internship with a business company, she said.

Source

Read More...

Tata Power halts 4 generation units of Mundra Ultra Mega Power Project...

 

Mundra UMPP's 4 units stopped

Tata Power has temporarily stopped 4 of its power generation units at Mundra UMPP after a major fire broke out at the plant on 14th Nov. Tata Power in a mail to confirmed saying that, they have stopped the generation from CGPL, coastal Gujarat power limited, the company that operates, mundra UMPP, since a fire had occurred in conveyor gallery.

The coal feeding conveyor 4A and 4B were partly impacted. Tata Power has confirmed that the generation which is stopped is expected to start from Nov 24 onwards progressively, and full restoration of the station is likely by Dec 3rd.Company sources say that, the fire broke out at 4.30 am on November 14 when the Mundra plant was generating 3,040 Mw from four units.

Unit No. 2 was under shut down for the inspection of generator and transformer earlier itself. While, most of the damage is expected to be insured, analysts say that CGPL is expected to incur generational losses of 912 million units amounting to around  206 cr rupees. Even states like Gujarat, Mahrashtra, Haryana, Rajasthan, Punjab, which draw power from Mundra UMPP are expected to face significant generational losses.

According to experts, Gujarat, which has 47.5 per cent share in the drawal of power from the Mundra UMPP, will have a generation loss of 433 million units followed by Maharashtra, which has 20 per cent share at 180 million units; Punjab, with 15 per cent share at 114 million units; and Harayana and Rajasthan, both 10 per cent share at 91 million units each.

Source

Read More...

NHPC to supply 300 MW unallocated power from Subansiri Hydro Project to Assam State...

 

NHPC to supply 300 MW hydro power to Assam

Bowing to pressure, the National Hydroelectric Power Corporation (NHPC) has agreed to supply 300 MW of unallocated power to Assam from the Subansiri (Lower) Hydroelectric Power Project, in addition to 233 MW from the sub-lower Hydroelectric Project.

In a note circulated by the Ministry of Power regarding the updated status of the 2000 MW project, which has been mired in controversy, it claimed that the Technical Advisory Committee (TEC) constituted by the Planning Commission examined the various issues and based on its recommendation, the Dam Design Review Panel (DDRP) was formed, which in its recommendation, has validated the seismic design parameter adopted in the design of the project.

The note said that all downstream issues were examined by the Joint Steering Committee (JSC) and the NHPC has agreed to implement its recommendation having an implication of Rs 470 crore. It has also been decided to give 300 MW unallocated power to Assam, in addition to 233 MW including 25 MW free and 208 MW paid power – it is getting from the sub-lower Hydroelectric Project.

The note further said that certain design innovations in the energy dissipation arrangement (EDA) have been recommended as additional safety measures to allay the apprehensions and concerns expressed by some sections of the society relating to safety of the dam. Besides, the quantum of minimum continuous release, which was 6 cumec and one of the major concerns, has been reviewed and it has been agreed to maintain minimum continuous flow of 250-300 cumec operating one unit continuously, the note said.

There would be an insignificant adverse impact downsteam and benefits are manifold to boost economy, lifestyle and prosperity of the area, the Ministry of Power said.

The Subansiri Lower Project has been stalled for the last couple of years following agitations spearheaded by the All Assam Students’ Union (AASU) and Krishak Mukti Sangram Samiti and other anti-dam groups citing concerns over its downstream impact in Assam.

About flood moderation, it was stated that the Subansiri Lower Project is a run-of-the-river project with small pondage for peaking power, as well as to attenuate the floods during the Monsoon season by operating the reservoir at low level. The project would help flood having flood attenuation by regulated discharge of water in the river. During flood period, the reservoir would be operated 15 m below the Full Reservoir Level (FRL) having flood cushion of 442 Mcum.

Since it has been planned for flood moderation of the Subansiri river, when operated in integration with Subansiri (middle) and upper, their integrated operation can moderate hundred-year return flood below SLP.

The Thatte Committee that was appointed to go into the issue has categorically stated that there can be no flood control without dams.JSC has reiterated that in the Subansiri Basin, integrated reservoir operation of the Subansiri lower, middle and upper is required for effective flood moderation downstream.

Source

Read More...

Cross-subsidy surcharge in open access to rise in Maharashtra...

 

Cross Subsidy Surcharge in Maharashtra

Industries in Maharashtra will have to shell out more to avail open access due to a rise in cross-subsidy surcharge (CSS). The trigger is a recent order by the Maharashtra Electricity Regulatory Commission (MERC) to increase CSS from September 1 this year with retrospective effect.

Industry bodies argue open access will become an unviable proposition because, apart from higher CSS, they will have to pay charges towards transmission and distribution losses, wheeling charges and administrative charges. This will amount to more than Rs 3.60 per unit over and above the purchase of power through open access.

For extra high voltage (EHV) express feeder consumers, CSS in open access has increased from Rs 1.63 a unit to Rs 2.75 a unit; for EHV non-express feeder consumers, it has risen from Rs 1.20 a unit to Rs 2.26 a unit. In the case of high-tension express feeder consumers, CSS has increased to Rs 2.30 a unit from Rs 1.18 and for high-tension non-express feeder consumers, it has risen from 76 paise a unit to 1.82 a unit.

Jayant Deo, founder member of Maharashtra Electricity Regulatory Commission, told Business Standard: "'The increase in CSS is against the Electricity Act, 2003 and also the National Tariff Policy. In fact, as per the third proviso of section 42 (2) of the Electricity Act, 2003, the surcharge and cross-subsidies are required to be progressively reduced in the manner as may be specified by the regulator. However, in this case, MERC has not given the roadmap for the same. MERC’s order is against the very preamble of the Electricity Act, 2003 which demands transparency in the subsidies."

On the other hand, R B Goenka, chairman of Vidarbha Industries Association's (VIA) Energy Cell, said there won't be any competition in the power sector and the consumers drawing power from the state-run Maharashtra State Electricity Distribution Company will have no other option to purchase power from it despite high tariff. "In our view, the CSS is unrealistic and misplaced. CSS in open access cannot be increased till a road map for reduction in cross-subsidy is decided,'' he added. According to Goenka, VIA will soon approach the Appellate Tribunal for Electricity challenging the MERC's order.

According to S L Patil, advisor, Thane Belapur Industries Association, industries will not be able to avail cheap power from various sources in the country. Higher CCS, as proposed, will kill the spirit of competitiveness in the power sector and is detrimental to industrial growth, which is already struggling with the high cost of inputs, he noted.

Source

Read More...

November 18, 2013

Fairwood to make India global hub for green energy solutions...

 

Fairwood Smart Green

Fairwood Smart Green, a wholly owned subsidiary of the Singapore-headquartered Fairwood Smart Green Global, has lined up plans to eventually turn the Indian operation into global production hub for hardware and software for hi-tech automation products and solutions for renewable and infrastructure projects across the world.

Singapore-based Fairwood group and Slovenia-based Robotina Group are two major shareholders in the company.

With this in view, the company has already set up a large production facility at Gurgaon with a total capital outlay of Euro 1 million, which will primarily cater to India’s growing renewable power sector and eventually come up as a global sourcing hub.

“The manufacturing facility at Gurgaon will be making a range of hi-tech energy conservation devices, including the Hybrid Green Box, a stand-alone energy production and management system, which combines solar plant production, other renewable energy systems, for rural and remote locations and urban areas,” Vikas Chopra, CEO, said.

This will manufacture 5000 units of different sizes in the first year, but it has capacity of manufacturing 15000 units in the same facility, which is further expandable.

“This is just the beginning. We can either expand in the same facility or look at other locations as and when India becomes a sourcing hub for West Asia, Europe and other Asian countries,” he said.

“The company has also started working with an NGO at a far-flung village in Jhansi with the objective of empowering homes, irrigation wells, community centers and primary schools. The company has set a target of covering 200-500 villages for rural electrification across various states of India including Bihar, Orissa, Uttarakhand, Uttar Pradesh, Himachal and Northeast states. The same model will be replicated in other Asian countries as well,” he said.

“The huge potential and vast scale of the Indian market have been the two key reasons for Fairwood Smart Green to set up its production facility in India. We aim to establish India as a base for production of hardware and software for hi-tech automation products and solutions for renewable and infrastructure projects across the world. The potential for off-grid, mini-grids, and smart-grids, is enormous in rural and remote areas of India, as well as in other countries of Asia, such as Indonesia, Philippines, etc . Announcements in this regard will follow soon,” said Ranbir Saran Das, vice chairman, Fairwood Group.

Devid Palcic, CEO of Fairwood Smart Green Global, on his parts, said that the whole idea is to offer services that are responsible for overall reduction in energy and optimisation of manpower requirements, with features supporting remote management of energy, manpower, safety, security, failure detection and preventive maintenance.

“The Hybrid Green Box, for instance, is an integrated power generation system, which is easy to install and provides efficient, reliable and sustainable power supply. All products have integrated intelligence and feature full remote monitoring and management. This unique concept enable ‘green boxes’ to be integrated into smart city concept, to be included in the virtual power plants and to provide full demand side management, ensuring energy where and when most needed,” said Palcic.

Source

Read More...

Three Indian firms shortlisted for Zayed Future Energy Prize...

 

Three Indian firms receives Zayed Futuer Energy Price

Three Indian firms have been shortlisted for the Zayed Future Energy Prize, the world's top award for innovation in renewable energy and sustainability.

The finalists, announced yesterday from 552 submissions from 88 countries, include three global corporations, small and medium enterprises from India, the United States and Belgium, three non-governmental organisations and 10 high schools.

The winners will be announced on January 20 to coincide with Abu Dhabi Sustainability Week.

The shortlisted submissions were evaluated by the jury panel across five categories: large corporation, non-governmental organization (NGO), small and medium enterprise (SME), lifetime achievement, and global high schools.

Abellon CleanEnergy, a bio energy company, and SELCO, a solar for-profit social enterprise, in SME category and Kalkeri Sangeet Vidyalaya (India) representing the Asia region are among the finalists for the 2014 prize.

The Prize jury includes heads of state, leading energy experts  and world-renowned personalities committed to the global effort of accelerating the adoption of renewable energy and sustainability.

"Our winners are global and their impact has been truly global. In six years, the Prize has grown into a platform that impacts the lives of many around the world, accelerating energy and water access, renewable energy advocacy and deployment and energy efficiency, even while creating education and job opportunities through the projects pioneered by our winners,"

Director General of the Zayed Future Energy Prize, Sultan Ahmed Al Jaber, said.

"The Zayed Future Energy Prize is one of a kind - it is the only prize that recognizes and rewards the solutions for the future. The Prize shows us that a different kind of future is possible," Chairmain of the Jury panel Lafur Ragnar Grmsson said.

Source

Read More...

Interaction with ABB's global head of power on India's renewable energy segment...

 

image

While weak macro-economic situations hamper India’s power infrastructure sector, multinational power products makers, ABB Ltd have evolved a flexible business model to sail through the weakness in domestic market.

In an interaction with Rutam Vora, during the opening of its new transformers factory at Savli, ABB Ltd’s global head of power products division, Bernhard Jucker explains how the company uses India factories as feeder units for its global factories to survive domestic slackness and what the future prospects are in the renewable segment for the company in India. Edited excerpts:

Considering the present power infrastructure scenario in India, what do you think about government policies for power infrastructure sector’s growth?

There are plans and strategies in place for stronger and smarter transmission grids. But it is also important that investments follow the said plans. So, what is needed is known, the technology to do it is also there, it is the implementation and the speed of implementation that is to be looked at now.

It is up to the utilities, which are in-charge of executing those plans to ensure that the transmission corridors are set up and losses are reduced. These elements will help fuel growth of the sector.

When do you see things getting favourable for power infrastructure companies? In the present scenario, how will you plan your investments for India operations?

Can’t say anything about future as the country goes to elections in coming months. A lot depends on elections and the new government. But broadly, in a growing market like India, the key fundamental drivers for power sector’s growth are there. We see new infrastructure capacities coming up, and there is opportunity to built state of the art facilities, reduce T&D losses, and plug the demand-supply gap.

For ABB’s power products, India is one of our biggest manufacturing hubs in the world. We invest in those products which have varied applications like renewable, conventional power generation and also to infrastructure like housing. We have had good success in solar in India, or the power systems.

What potential do you see in renewable segment in India for a company like ABB?

The potential is there. It’s the question of how the countries’ regulators or the politicians deal with it. In wind, it was a booming market till recently but all of a sudden it went down. Similar is the case with solar. There is growth at present, but let’s see what happens now onwards. In India, it depends more on the regulator, on the subsidies offered and how the market dynamics play.

Presently, we deliver the main components to renewable segments. For wind we supply everything electrical inside a windmill including generator, inverter convertors and medium voltage switchgears and transformers. For solar, except the cell, ABB has the whole value chain of power products which fit or support the application in renewable. So, we are prepared to serve the renewable solutions in India and we have all the products lined up.

How have you managed to sustain the current weakness in the India’s power infrastructure business?

In the power products segment, we have been able to increase portion in our exports. It is giving additional volume to support the business in India, which is passing through a challenging environment at present. Our world-class facilities operate as feeder units for the other factories globally.

This gives us cushion during any lean spell in domestic market. Currently, our export from India operations is 15% of total sales and they are growing. Because of the feeder factories network, ABB has the flexibility to balance the domestic demand-supply fluctuations with the international demand.

We have products that are totally global. You can say almost single source is India for the globe. We have sent transformers as far as the US. So, we have flexible market to cater to, and that is why it is important to set up world-class facilities in India. The concept works in such a way that the idea is to balance the demand and supply. It’s not like saying that your core market is your domestic market.

Is India moving towards ultra high voltage transformers? What are the prospects for it?

For a strong grid, you need ultra high voltage corridors because higher the voltage, lower the losses. If that is 800 kv or 1200 kv, it depends on topology of the grid you are setting up.

But in a large country like India there is a potential for ultra high voltage transformers like 1200 kv. We have recently delivered one 1200 kv transformer for PGCIL. Looking at the geographic expansion of power grid in India, we see overall trend towards high voltage.

Also, with increasing urbanization, there is a need for space efficient, environmentally friendly and quick-to-install switchgears and distribution transformers.

Gas-insulated switchgears (GIS) cuts down the size of carbon foot print by 90% of that be air-insulated switchgear (AIS) up to 90%. In the distribution transformers, dry-type transformers are safer at places like cinema buildings, hotels, multiplexes etc.

Source

Read More...

Monthly review of Indian Power Sector - October 2013...

 

Monthly Review of Indian Power Sector

 

During the month of October 2013, around 530 MW of generating capacity has been installed under the Indian Power Sector reaching the total cumulative generating capacity at around 229.25 GW.

Further around 411 Circuit Kms of transmission lines are also added.

 

Summary of the review of Indian Power Sector for the month of October 2013 is depicted below:

  • Electricity Generation for the month of October was at 79.44 BUs
  • Generating Capacity Addition for the month was 530 MW
    • Commissioning of Unit 6 (500 MW) of Rihand STPS III by BHEL on 7th October
    • Commissioning of Unit 2 & 3 (30 MW) of Nimmo Bazgo Hydro Project by NHPC on 31st October
  • The all India installed capacity reaches at 229251.74 MW
  • Transmission Lines for 411 Circuit Kms installed during the month
  • Transformation Capacity Addition during the month was 7225 MVA
  • Average Power Supply deficit was around 3.5% during the month
    • Northern Region - 6.2%,
    • Western Region - 0.7%, S
    • outhern Region - 4.5%,
    • Eastern Region - 1.3%,
    • North Eastern Region - 5.0%
  • Peak Power Supply deficit was at 3%
    • Northern Region - 6.7%,
    • Western Region - 0.1%,
    • Southern Region - 2.2%,
    • Eastern Region - 1.3%,
    • North Eastern Region - 4.3%
  • All India Plant Load Factor maintained was around 61.85%
    • Central Generating Plants -  68.78%,
    • State Generating Plants - 54.44%,
    • Private Generating Plants - 63.25%

Detailed report on the same will follow.

Source: CEA

Read More...